Three to seven years for wood. About ten for vinyl. Around five for aluminum. Those are national repaint intervals from named sources, and they are the quickest way to see why the siding on your West Jordan house changes the plan. The painting itself is done by the licensed local contractor that Jordan Valley Painters, a referral service, matches you with.
Cost and repaint interval, by material
Thumbtack's cost ranges use Xactware data and price priming and painting a 2,500-square-foot home in good condition. The intervals come from Nationwide and Angi, and the fiber cement row uses Sherwin-Williams' general figure for exterior paint.
| Siding | Cost range | Repaint interval | Interval source |
|---|---|---|---|
| Aluminum | $1,040 to $2,800 | Around 5 years | Angi |
| Wood | $1,390 to $3,741 | Every 3 to 7 years | Nationwide |
| Vinyl | $1,690 to $4,549 | About every 10 years | Nationwide |
| Fiber cement | $1,898 to $5,111 | Sherwin-Williams' general figure for exterior paint, 7 to 10 years depending on climate, surface material and paint quality, not a fiber cement figure | Sherwin-Williams |
Sources: Thumbtack, Nationwide and Angi. For brick and stucco pricing see the cost page and the stucco page.
Wood siding
Wood's repaint interval in this table can come soonest, from three years, and prep decides how long the job lasts on every material. Loose and peeling paint is scraped and the edges feathered by sanding. Glossy old paint is dulled so the new coat can grip. Bare wood and patched areas get primer, and Sherwin-Williams says to prime bare wood, brick or stucco to improve adhesion. Cedar and redwood need a stain-blocking primer so tannin does not bleed through. Rotten boards are carpentry. A painter is not a carpenter, so ask who repairs the boards and how that is priced.
Wood holds more water than metal or vinyl after a wash or a storm. Sherwin-Williams says to allow at least 24 to 48 hours for the house to dry after pressure-washing, and to wait at least one day after a heavy rain. West Jordan's design criteria give 16 inches of rain a year.
Caulk and the laps of the siding
Sherwin-Williams says old caulk that is cracking or pulling away should be dug out and replaced, and butt joints caulked. It also says not to caulk the lap joints of siding, because they let moisture out from behind the wood. A painter who caulks every horizontal line is working against that guidance. Ask which joints get caulk and which are left open. Source: Sherwin-Williams surface preparation FAQ.
Aluminum siding
Aluminum has the lowest cost range in the table and, per Angi, around five years between paint jobs. Chalky aluminum siding and faded vinyl must be cleaned of chalk or the new paint will not stick. That is a prep line to look for in the written quote. Sherwin-Williams' 48-hour dew guidance applies to every material after painting.
Vinyl siding and the color limit
Sherwin-Williams advises against painting vinyl siding any darker than its original color unless the coating is designed for it. The reason it gives is that dark colors absorb more heat, and the siding can flex enough to come unfastened. If you want a darker color, ask the contractor which product is made for it, and read the label. Source: Sherwin-Williams product selection FAQ.
Fiber cement
Thumbtack's range for fiber cement, $1,898 to $5,111, is the highest of the four materials in the table above. Ask the contractor what their product lasts on fiber cement and what the product label says.
The weather window, in a line
Sherwin-Williams' general guidance is to avoid painting below 50°F or above 90°F. Some Sherwin-Williams exterior lines can be applied down to 35°F. Sherwin-Williams says the temperature should ideally stay in the product's range and above the dew point for at least 48 hours after application, and that exterior paint typically needs at least 24 hours to cure before rain. West Jordan's winter design temperature is 8°F, per the city's design criteria, which is a building-design value rather than a forecast. The full repaint page has the table with sources.
Houses built before 1978
If your house was built before 1978, the year built is a separate question from the siding material. Anyone paid to do work that disturbs its paint must be certified under the EPA's lead-safe rule. Minor work that disturbs 20 square feet or less of exterior paint (six square feet or less per room inside) is not covered, but window replacement and demolition of painted surfaces are always covered. See the lead-safe painting page. Your own papers give the year for your house, whatever neighborhood it is in.
What to ask a siding painter
- What is the prep for this siding type, and where is it written in the quote?
- Is any caulking planned at the lap joints? Why or why not?
- For vinyl: is the chosen color darker than the original?
- For wood: who repairs rotten boards, and how is that billed?
- How many coats, which product line, and what sheen?
- Is the company licensed in Utah? Check the state lookup.
Common questions
Which siding costs the least to paint?
In Thumbtack's national table, aluminum, at $1,040 to $2,800 for a 2,500-square-foot home in good condition. Stucco is the highest.
Does the city need to approve a siding repaint?
Ordinary exterior painting is on the permit-exemption list in the Utah-amended 2021 IRC. The list is in a third-party copy of the Utah-amended 2021 IRC, Chapter 1 (UpCodes). Rules and fees change, so ask West Jordan Building & Safety at 801-569-5050 (city building and safety page) about a given job. Replacing siding is different work, and the city is the office to ask about it. See rules and approvals.
How do you ask for a match?
Use the request form on this page or call (385) 444-7485. Asking costs nothing. The contractor sets the scope and price after seeing the house.
Where these numbers come from
Read in November 2026: Thumbtack, Nationwide, Angi and Sherwin-Williams.