Satin or semi-gloss for trim and doors. Flat is fine for large wall surfaces. That is Sherwin-Williams' sheen guidance, and it is the first decision on a trim and door job. Jordan Valley Painters works as a referral service, matching West Jordan homeowners with licensed local contractors, and the contractor you are matched with sets the price and the schedule. This page is for homeowners who want the details of the house refreshed, the window and door trim, fascia, soffits and the doors, without repainting every wall.
What counts as trim work
- Window and door casings.
- Fascia, the board along the roof edge.
- Soffits, the underside of the eaves.
- Entry doors, and the garage door.
- Corner boards and other detail pieces.
A full repaint covers all of these along with the walls. A trim-only job takes them alone. See the full repaint page if you are weighing the two.
What it costs
Thumbtack's national range for painting a whole exterior is $2,371 to $6,443, and Angi puts exterior painting at $1.50 to $4 per square foot of paintable area. Trim and doors are part of that paintable area when they are included. For a trim-only job, ask the contractor for the trim work as its own line in the quote, so you can compare. The cost page has the national tables and their sources.
Sheen: Sherwin-Williams' guidance
Sherwin-Williams says satin or semi-gloss works best on trim and doors, while flat finishes can be used on large wall surfaces. Trim and doors are the parts of a house that get touched and cleaned, which fits that guidance. Pick the sheen with the contractor, and have it written in the quote for walls and trim separately. Source: Sherwin-Williams exterior painting guide.
Prep on trim matters as much as on walls
Sherwin-Williams says up to 80% of coating failures can be directly attributed to inadequate surface preparation. Trim has edges, joints and bare wood, so prep matters there as well. Steps to look for in the quote:
- Clean. Trim is washed to remove dirt, mildew and loose paint, then left to dry. Sherwin-Williams says to allow at least 24 to 48 hours for the house to dry after pressure-washing.
- Scrape and sand. Loose paint is scraped and edges feathered. Glossy old paint is dulled so the new coat grips.
- Repair. Rotten trim, split boards and swollen edges are repaired or replaced. A painter is not a carpenter, so ask who does this and how it is billed.
- Caulk. Old caulk that is cracking or pulling away is dug out and replaced, and butt joints are caulked. The lap joints of siding are left open, because they let moisture out from behind the wood. Caulk dries before paint goes over it, or the paint cracks.
- Prime. Bare wood gets an exterior primer. Sherwin-Williams says primer on bare wood, brick or stucco improves adhesion.
Sources: Sherwin-Williams surface preparation and surface preparation FAQ.
Bare wood does not wait
Sherwin-Williams says wood not protected from UV rays can turn silver-gray in as little as six months. If a repair leaves bare wood on a fascia board or a door edge, that is a reason to prime it and finish it soon, not to leave it for the next season. Today's Homeowner says UV rays pose the greatest threat to a paint job, with prolonged exposure leading to fading.
Timing in West Jordan
Trim work still follows the weather limits. Sherwin-Williams' general guidance is not to paint below 50°F or above 90°F, and some Sherwin-Williams exterior lines can be applied down to 35°F. Sherwin-Williams says the temperature should ideally stay in the product's range and above the dew point for at least 48 hours after application, that exterior paint typically needs at least 24 hours to cure before rain, and that work should wait at least one day after a heavy rain. West Jordan's design criteria give 16 inches of rain a year and a winter design temperature of 8°F, which is a building-design value rather than a forecast. Sherwin-Williams warns that dew forms as soon as the sun goes down and can get into uncured paint. A good crew follows the shade around the house and stops early enough for paint to set before sunset, so ask the contractor how the schedule handles it. Sources: Sherwin-Williams guide and product application FAQ.
Houses built before 1978
Window trim and doors count as painted surfaces like any other. If your house was built before 1978, anyone paid to do work that disturbs paint on it must be certified for lead-safe work under the EPA's rule. Minor work that disturbs 20 square feet or less of exterior paint (six square feet or less per room inside) is not covered, but window replacement and demolition of painted surfaces are always covered. Read the lead-safe painting page before you ask for a quote.
What to ask
- What is the prep on trim, and who does wood repair?
- What sheen on trim and doors, and what on the walls?
- Which joints are caulked, and how long does the caulk dry before painting?
- What primer goes on bare wood?
- Is the house pre-1978, and is the firm lead-safe certified?
- Is the company licensed in Utah? Check it on the state lookup.
Common questions
Does painting trim need a permit in West Jordan?
Ordinary exterior painting is on the permit-exemption list in the Utah-amended 2021 IRC. The list is in a third-party copy of the Utah-amended 2021 IRC, Chapter 1 (UpCodes). Replacing windows or doors is different work, and the city is the office to ask about it. Rules and fees change, so ask West Jordan Building & Safety at 801-569-5050 (city building and safety page) about your job. More is on the rules and approvals page.
Can you ask for a trim-only match?
Yes. Say so on the request form on this page or call (385) 444-7485. Asking costs nothing, and the contractor decides whether to take a trim-only job.
Where these numbers come from
Read in November 2026: Thumbtack, Angi, Sherwin-Williams and Today's Homeowner.